Summer House Dry Base Lite Installation

  • Slide title

    Write your caption here
    Button

After a Free consultation, he was reassured that the Dry Base Lite System was the ideal solution as it could be installed with minimum disruption. The base installation was completed within 5 hours


Our clients contacted us after purchasing a Summerhouse. Their only concern was the uneven ground where the base was to be installed and the possibility of damaging their very neat garden and driveway with building materials and skips.


They were extremely surprised to find out we could actually install the Summerhouse with our Dry Base Lite steel frame system without the need for skips and with no damage to the garden or driveway


Share by: