To cope with the fall of the site 18” over 10 ft, a steel wall was added to the front of the frame and to prevent any possibility of slippage, 2 x Dry Base rodding systems were also added with 5ft rods driven in at angles for extra peace of mind, then finished with an anthracite coloured steel cladding.


The whole installation was carried out cleanly with very little disruption and finished in approximately 5 hours


Dry Base Lite System 14’ x 10’: £1837

Extra walling and 2 x pile rodding systems: £454

Total cost inc VAT: £2291


Our client in Somerset contacted us after purchasing a 14’ x 10’ Malvern Bloomsbury Garden building.


Their main concern was the location for their installation. The site was going to be quite a logistical challenge to install a brick and concrete slab base as it was on a steep sloped area at the far end of the garden. The thought of not only transporting building materials to the site, but the work and time involved to put in footings, brickwork, backfill and concrete a base was a little bit daunting.

After consultation on how our system works, our clients had no hesitation in ordering the Dry Base Lite System.