Studio Pavilion Garden Building 22’ x 8’ Base Installation - Buckingham
After a Free consultation, he was reassured that the Dry Base Lite System was the ideal solution as it could be installed with minimum disruption. The base installation was completed within 5 hours without the need for skips with no damage to the garden or driveway